Thank You

Your Planning Kit is ready to download

Thanks for buying the Ontario Garden Suite Planning Kit 2026. Download both files now and save them somewhere you will find them again. Stripe emails your receipt separately.

2026 edition · Licensed for your own project · Please do not share this page link

Start here

Save both files first. Read Chapter 1 of the guide tonight, then run the free Rules Checker for your town. Open the Budget Workbook and type each quote into the yellow cells as it arrives. Print the four checklists in Chapter 8 and bring them to every meeting.

Your files

Two Downloads, Both Yours to Keep

Garden Suite Planning Kit 2026 (PDF)

29 pages, eight chapters: zoning, the real budget, servicing and septic, permits, money, hiring a builder, renting it out, and four printable checklists.

Download the PDF guide

Garden Suite Budget Workbook 2026 (Excel)

Budget with live totals, 10% contingency and 13% HST; a 3-builder Quote Comparison; Rental Cash Flow; and a Timeline that works out your move-in date.

Download the Excel workbook

Download not starting? On a phone, press and hold the link and choose to download or save the file. On a computer, right-click the link and choose “Save link as”. Still stuck? Reach us through the contact page with the email address you paid with and we will send the files.

How to use it

The Order We Would Do It In

Read Chapter 1 and check your town

Use the zoning desk script, then the free Rules Checker. Write down the by-law section number for every rule. “Should be fine” is not a section number.

Walk the lot with the Lot Check list

Find where the sewer leaves the house, measure the fire access path, and on a rural lot find the septic bed before you pick a spot.

Set up the Budget sheet

The workbook starts at our 2026 midpoints. Replace them with real numbers as quotes arrive. Keep the 10% contingency and leave it alone.

Interview three builders

Bring the 20 questions from Chapter 6. Enter every quote in the Quote Comparison sheet so each price answers the same question.

Line up the money before you dig

Chapter 5: grants and the CMHC refinance want approval before work starts. On a rental, sort out the HST question before the first lease.

Want us to look at your actual lot?

The $399 + HST Garden Suite Feasibility Report checks zoning, fire access, servicing route and septic on your property, with a sketch and a realistic budget range, in 48 hours. The fee is credited toward permit plans or a build.

Get My $399 + HST Lot Report →

Got a quote that does not smell right?

Book a 30-minute call for $149.99 + HST, or a 60-minute quote or plan review for $249.99 + HST. Credited toward any report, permit package or build.